The Complete Project Management Platform Built for Engineering Firms
Streamline projects, track time, manage teams, and generate invoices - all with specialized engineering tools and AI assistance

Stop Wrestling with Disconnected Tools
Engineering firms waste countless hours switching between tools, manually calculating loads, and chasing project updates. There's a better way.
The Problem
Current workflow challenges
The Solution
Pulse Point integration
Everything You Need in One Platform
Purpose-built features that understand how engineering teams work, with the flexibility to adapt to your firm's unique processes.
Smart Project Management
Advanced project templates and real-time monitoring built for engineering workflows
- Project templates for all engineering phases
- Task dependencies and team capacity planning
- Real-time project health monitoring
- Budget and schedule tracking
Engineering-Specific Tools
Specialized calculators and technical tools that speak your language
- Gas Sizing Calculator with IFGC compliance
- AI-enhanced pressure drop analysis
- Technical report generation
- Professional documentation tools
Integrated Time & Billing
Seamless time tracking to automated invoicing in one unified system
- Comprehensive timesheet management
- Automated invoice generation
- QuickBooks integration
- Expense tracking and approvals
AI-Powered Insights
Meet Paul, your intelligent project assistant that learns from your workflows
- Paul: Your intelligent project assistant
- Automated content generation
- Utilization forecasting
- Performance analytics
Team Management
Coordinate multi-disciplinary teams with precision and transparency
- Multi-disciplinary team coordination
- Capacity planning and workload balancing
- Role-based permissions
- Approval workflows
Advanced Analytics
Executive dashboards and insights that drive better business decisions
- Executive dashboards
- Portfolio health scoring
- Financial performance tracking
- Custom reporting
Built for Engineering, Not Adapted From It
We understand that engineering projects have unique requirements. Our platform is designed from the ground up with engineering workflows in mind. See how teams keep drawings and specs in one place in our guide to secure cloud document management for engineering teams.
Project Phase Templates
Pre-configured workflows for Schematic Design, Design Development, Construction Documents, and Construction Administration phases
MEP/Structural/Civil Ready
Industry-specific tools and templates for mechanical, electrical, plumbing, structural, and civil engineering disciplines
Professional Compliance
Built-in compliance tracking for IFGC, IBC, ASHRAE, and other industry standards with automated documentation
Technical Calculations
Advanced calculation engines for load analysis, pressure drop, pipe sizing, and other engineering calculations
Industry Standards Supported:
Commercial Office Building - MEP Design
Measurable Results That Drive Growth
Engineering firms using Pulse Point see significant improvements in productivity, efficiency, and profitability within the first 30 days.
Get projects started faster with pre-configured templates and automated workflows
Better workload balancing and capacity planning across all team members
Automated time tracking and billing integration eliminates manual invoice creation
AI-powered engineering calculations ensure accuracy and compliance
Choose the Right Plan for Your Firm
Select the plan that best fits your team size and needs. Contact us for a personalized consultation.
Professional
For growing engineering firms
- Unlimited projects
- Advanced engineering templates
- Gas sizing calculator
- AI-powered insights (Paul)
- Advanced analytics
- Email support
- Custom workflows
- Team capacity planning
- Professional reporting
Enterprise
For large organizations
- Everything in Professional
- Unlimited users
- QuickBooks integration
- Custom integrations
- Dedicated account manager
- Advanced security features
- Custom training
- API access
- Custom reporting
Feature Comparison
| Features | Professional | Enterprise |
|---|---|---|
| Active Projects | Unlimited | Unlimited |
| Gas Sizing Calculator | ✅ | ✅ |
| AI Assistant (Paul) | ✅ | ✅ |
| QuickBooks Integration | ❌ | ✅ |
| Custom Integrations | ❌ | ✅ |
| Support Level | Dedicated |
Ready to Get Started?
Contact us today to discuss which plan is right for your engineering firm and get a personalized demonstration.
Frequently Asked Questions
Get answers to common questions about Pulse Point Project Tracker
Security is our top priority. We use enterprise-grade encryption (AES-256), secure data centers with SOC 2 Type II certification, and maintain strict compliance with industry standards. All data is backed up regularly, and we offer role-based access controls to ensure only authorized team members can access sensitive information.
Still have questions?
Our engineering specialists are here to help. Schedule a personalized demo to see how Pulse Point can transform your project management workflow.
Ready to Transform Your Engineering Projects?
Let's discuss how Pulse Point can help you streamline project management, improve team collaboration, and boost productivity at your engineering firm.
Location
Medina, OH
See what a call produces first: an anonymized sample roadmap, emailed to you as a PDF.